Installing at West End

Author
mediachef
Post
08.31.2009
 
Camille Utterback, West End project (studio). Studio before we sent out the lights. The lights are naked as all but one test acrylic tube had already been shipped.

Camille Utterback, West End project (studio). "Studio before we sent out the lights. The lights are 'naked' as all but one test acrylic tube had already been shipped."

Camille Utterback begins installation of her West End project today. I’m excited to go visit and see the installation. They plan to hang some styrofoam pool “funnoodles” as a mockup to lock in the column heights/locations.

Prior site visit photos.

Prior site visit photos.

Here’s a link to a set of photos from a site visit last week checking out the wood railing by Utterback’s collaborator, Brett, who did the engineering on the project.

A good shot of one of the Railing Sensor housings in place.

"A good shot of one of the Railing Sensor housings in place."

Our clear test cable guard (will be stainless steel).

"Our clear test cable guard (will be stainless steel)."