Public art commissions 01SJ Biennial
For Artists
San Fernando Corridor Project – Request for Qualifications
San Jose Public Art and ZER01 invite artists to submit qualifications and letters of interest to install temporary artworks on the San Fernando Street corridor in Downtown San Jose. These artworks will be installed in June 2010, be a feature of the 3rd 01SJ Biennial (September 15-19, 2010) and will be continue their display through October 2010.
Background: San Fernando Street
San Fernando Street is a significant east/west corridor through downtown San Jose that connects Diridon Station, the major train, light rail and bus center on the west side of downtown; continues through the sports, retail and cultural district; and defines the north side of San Jose State University at downtown’s east edge. The street passes from the station, beneath State Highway 87 and over the Guadalupe River before entering the downtown core. As such, the street offers a variety of opportunities for the creation of artworks in different media ranging from static to electronic, sound, projection, light-based, interactive and mobile or networked. The artworks will be accessible to anyone who works, lives or visits downtown San Jose.
Background: 2010 3rd 01SJ Biennial
The 3rd 01SJ Biennial will take place September 15-19, 2010, throughout San Jose and Silicon Valley. Its theme, “Build Your Own World,†is about how powerful ideas and innovative individuals from around the world can make a difference and come together to build a unique, city-wide platform for creative solutions and public engagement. It is about the inspiration needed to build a world we want to live in and are able to live with. The 2010 01SJ Biennial is predicated on the notion that as artists, designers, engineers, architects, marketers, corporations and citizens we have the tools to (re)build the world, conceptually and actually, virtually and physically, poorly and better, aesthetically and pragmatically, in both large and small ways.
PROJECT BUDGETS: Vary depending on site
ARTIST ELIGIBILITY: U.S. residents are invited to apply, or those who have a US Social Security or Tax Identification Number by the application deadline.
APPLICATION DEADLINE: Submissions (described below) must be received as a complete application in CaFÉ™ by no later than 12 midnight Mountain Daylight Time (MDT) on Thursday, October 8, 2009.
APPLICATION PROCESS: All materials will be submitted online, via CaFÉ™ website (www.callforentry.org). There is no application fee to apply or to use the CaFÉ™ online application system. To view the application, go to www.callforentry.org, register a username and password, navigate to “Apply to Callsâ€, and search the list for “City of San Jose – San Fernando Corridor Projectâ€.
For full details and application process read the Request for Qualifications.
DOCUMENTS FOR REFERENCE IN APPLYING FOR PROJECTS WITH THE CITY OF SAN JOSE PUBLIC ART PROGRAM
Design Contract – Boilerplate (PDF)
Fabrication Contract – Boilerplate (PDF)
City of San Jose Standard Specifications (External)